Daily Toolbox Talks

The toolbox talk that writes itself.

Every morning at 6am, Sitepack builds a 3-minute toolbox talk from today's weather, your active hazards, and what happened yesterday. It lands on the site lead's phone before the crew's even parked — audio ready to play, sign-on QR attached.

How it works

Set it once. It runs every morning.

1

Mark your active sites

Point Sitepack at the jobs you're running. That's it — nothing to configure, nothing to schedule. If the site's active today, it gets a talk.

2

6am, a talk lands

An SMS on the site lead's phone, with audio ready to play through the ute speakers. Built from today's weather, your active SWMS hazards, and yesterday's near misses.

3

Play it. Sign on. Go.

Play the audio at the pre-start, crew scans the QR to sign on. Attendance recorded, talk archived, on to the job.

What's different

Today's talk, for today's site.

Not a generic library

Most toolbox talk templates are recycled PDFs written by someone who's never been on your site. Sitepack builds this morning's talk from your active hazards and today's weather.

Voice, not paperwork

The talk arrives as audio you can play, not a script to read. The site lead runs the talk. The crew hears the talk. Nobody stands there reading a laminated card.

Sign-on by QR

Workers scan the QR on the site lead's phone — no app, no login, no account. Attendance sits on your record without anyone having to write on a clipboard.

Yesterday feeds today

If you logged a near miss yesterday, tomorrow's talk covers it as a learning moment. Your talks compound over the life of the job.

SMS, not another app

Every phone on site already has it — no install, no login, no data plan, and nobody asking you to reset a password at 6am.

Sample topics

What a Sitepack talk actually covers.

Working at heights on the scaffold today. Wet overnight — check plank surfaces before you climb. Two edge protection sections were re-tensioned yesterday, they hold. Watch the weather again around 2pm.

Manual handling on the concrete pour. 32°C expected — rotate the pour crew every hour, water at each corner of the slab. Yesterday's near miss was a hose whip near the pump — cordon the line, one person on the deadman.

Trip hazards during the fit-out. New sparky crew on site today — brief them on the storage lay-down and the cable trays running down the east corridor. Housekeeping at smoko.

Common questions

Toolbox talks, straight answers.

What is a toolbox talk?

A toolbox talk is a short daily safety briefing — usually 60 to 90 seconds — that the site lead gives the crew before the shift or before a specific task. It's a chance to flag today's hazards, remind the crew of the controls, and get sign-on that everyone heard it. Different from a SWMS, which is the plan for a specific high-risk job.

How often should toolbox talks happen?

Daily on active sites is the standard on Tier 1 and Tier 2 jobs. Sitepack generates a fresh talk every morning at 6am so it's ready before the crew's parked. You can also run extra talks after a near miss, when the weather turns, or when a new trade arrives on site.

What topics should a toolbox talk cover?

The topics that actually matter today — the weather forecast, any near misses from yesterday, the specific hazards of the trades on site, and any changes to the plan. Sitepack pulls this in automatically, so you're not reading a generic 'be careful with ladders' talk from 2018.

See all Sitepack FAQs →

The rest of Sitepack

Four tools. One kit.

Voice-to-SWMS →

Talk about the job for 30 seconds, get a site-specific SWMS with the right HRCW categories flagged.

Take 5 by voice →

A hazard check at the point of risk. Crew taps once, describes the task, and Sitepack files a Take 5 to the right site.

Incident & near-miss reporting →

Photograph the scene, describe what happened, and Sitepack drafts the report — with the state regulator's number front and centre if it's notifiable.

Tomorrow's talk, ready before the crew arrives.

Free trial. No card. Set your first site in ten minutes.

Start free trial